
Monday, December 31, 2007
Saturday, December 29, 2007
Anise jacket

I'm determined to join the pieces and not leave them languishing as I usually do. My mother's friend Jean kindly provided me with matching yarn to seam, as the Ribbon Twist is too bulky and loosely spun to use, so I have no excuse.
I'm trying hard to choose a colour for my next hipknits project. I'm torn between candy shop, tandem, choc cherries or bingo, although the first two are shading it. Candy shop might look good with biscuit, and tandem with navy or biscuit.
Friday, December 28, 2007
The reveal





Thursday, December 20, 2007
Countdown - 5 days to go
1) Stripy throw - finished, although there are still a few ends to darn in
2) MD garter scarf - finished
3) matching beret - increase section done, just starting decreases
4) montego bay scarf - knitting finished, fringe needed
5) crocheted stripy scarf - rashly promised to be made with leftovers from the throw, but not critical for Christmas
My sister is the one who is most concerned about her woolly gifts, so the beret is my knitting priority.
My blog was disabled this week because blogger identified it as a spam blog. Now I make no literary claims, but calling it spam is a bit harsh. I responded to the email they sent, and they did unblock it in two days, but still a bit irritating.
For those who liked the Christmas stocking, I got in touch with Debbie Abrahams, the designer. She confirmed that she is still planning to sell the kit on her website, but is very busy right now, so not sure when she will be able to do it. Just to clarify, this is not a free design, but Debbie is planning to sell the kit.
Sunday, December 16, 2007
Gift knitting


Monday, December 03, 2007
A Christmas stocking
The tutor was Debbie Abrahams, who is a very energetic teacher. She has taught this class for two years, and is planning to put the kit of the project up on her website (not there yet).
Although the finished object is a sock, it is knitted flat, then sewn up at the end. As it's not designed for wearing, it's not really a problem to have a seam.
The stocking starts with some ribbing, followed by fairisle snowflakes. My problems started here. I managed to keep the floats nice and loose, but was very slow knitting this section. I was the only continental knitter there, and struggled to get a suitable hold. I tried to knit with two hands, but found having the dominant yarn in my right hand difficult to knit quickly and evenly. If I switched yarns, I couldn't easily weave the yarns. I think I need to do some internet reasearch to work out how to do this.
The next section was intarsia, which I had never tried. This was an ordeal of bobbins and ends, but everyone seemed to be in the same boat. Again, I couldn't really work out a standard way to hold the needles but just consciously twisted the yarns together at the edges. I'd recommend darning in and tidying ends as you go, and not making them too long. I'm fairly happy with the back of mine.

After that, it got easier. Beading is easy and fast, and I had done this at a previous workshop. The stripes and heel turn were easy, although it seemed a bit odd to do it in two sections.

I Swiss darned the tree trunks and decorations before I drew up the toe, just so I was working on a flat surface. It was tricky to secure all the ends without them showing through, but is worth the faff.
The class was six hours long, and I had to work on it at home to finish it, but I estimate that it took me no more than ten hours to complete. I think it's really cute, and would make another. I certainly wouldn't have tackled the pattern unaided, and that's the real value of the class.
Stripy throw
